2 Results WayMarlborough, MA 01752
IndustrialComplete building characteristics, construction details, and site data from municipal assessor records and supplementary sources.
Available intelligence on this tab
Data coverage varies by municipality — check availability
Property professional?
Full access to 2 Results Way and 4.7M+ others
Free for 14 days, cancel anytime
Home owner, buyer, or seller?
Your agent can share the full report with you for free
2 Results Way is a Textile Mill industrial built in 1970 located in Marlborough, MIDDLESEX County, MA. The building has 144,090 square feet of building area on a 25.3-acre lot.
2 Results Way is in FEMA flood zone X. Zone X is outside the Special Flood Hazard Area, meaning the property has minimal flood risk according to FEMA mapping. The FEMA National Risk Index composite rating for this area is Very Low. The ASCE 7-22 design wind speed for this location is 123 mph. The ground snow load is 50 psf. The EPA radon zone is 1 (highest potential).
NE Provenance rates the fire protection for 2 Results Way at Grade C (Adequate fire protection access). The nearest fire station, MARLBOROUGH FIRE DEPARTMENT, is 1.7 miles away. This grade reflects fire station proximity, department capabilities, hydrant coverage, and municipal water infrastructure.
Municipal records show 1 building permit on file for 2 Results Way. The most recent permit was filed September 16, 2013. The current municipal assessment is $6,480,400, with $5,276,700 attributed to land and $1,203,700 to improvements.
2 Results Way is located in Marlborough, MIDDLESEX County, MA. The property is zoned RWMUOD (Results Way Mixed Use Overlay District). The median home value in this census tract is $521,500. Median household income is $116,565. The owner-occupancy rate in the surrounding area is 60%. The property is served by the Marlborough school district.
The complete NE Provenance report for 2 Results Way, Marlborough, MA includes over 430 data attributes sourced from 140+ public and proprietary datasets. The full report covers building construction and materials, NEP Condition Estimate derived from permit history, system ages for roof, electrical, plumbing, and HVAC, complete ownership and deed chain with transaction classification, FEMA flood and coastal hazard analysis, environmental contamination screening, and neighborhood demographics. Available as a professional property wallet, PDF report, or structured data export.